EDGE Manager user guide
- Product documentation
- Inseego 5G SD EDGE™
- EDGE Manager user guide
Creating a tunnel
1. On the Tunnels page, click on the plus sign next to Tunnels to add a tunnel.
The Create Tunnel dialog appears.
2. Select the CBR as Device A and click Next.
3. Select the FG2000 as Device B and click Next.
4. Configure as follows:
For both Device A and Device B:
- Listen Port - select an available listen port.
For Device B (FG2000):
- Remote Endpoint Details - select the WAN IP of the CBR from the drop-down.
5. Click Create. A Create Tunnel pop-up appears.
6. Click OK to create the tunnel. A Create Tunnel pop-up appears when the tunnel is successfully created.
7. Click OK.